Pioneers In Creating Opportunities

Expertise in Oilfield Technology & Service

News

News Banner

  • Home
    Home This is where you can find all the blog posts throughout the site.
  • Categories
    Categories Displays a list of categories from this blog.
  • Tags
    Tags Displays a list of tags that have been used in the blog.
  • Bloggers
    Bloggers Search for your favorite blogger from this site.
  • Team Blogs
    Team Blogs Find your favorite team blogs here.
  • Login
    Login Login form

Case Study - Production optimization control systems for Progressive Cavity Pump systems: (CPOP)

Posted by on in News
  • Font size: Larger Smaller
  • Hits: 6490
  • Subscribe to this entry
  • Print

The first prototype CPOP for Progressive Cavity Pump system prototype was deployed in the field for Compania Petrolera de Altamira under the service company Petrohuasteca located in Tampico, Mexico. The system was placed on well 1083D on September 2014, along with a KUDU Drive head. The well is producing an average of 50bpd.

The Second CPOP PCP system prototypes were deployed in the field in wells 1029H and 1019H. These systems were paired with NOV Mono Drive heads. The wells are producing an average of 50bpd, and 25bdp respectively, due to higher viscosity of the crude extracted. The consumption of liquid propane gas was reduced by 30 liters/day compared to the first prototype.

The third iterations of prototypes were deployed in wells 1027 and 1044. The drive heads used in these systems was the NOV Mono. The wells are producing an average of 35bpd and 68bpd respectively. The consumption is on par with the second prototypes, reducing the overall fuel consumption and cost of operation.

campo altamira





Progressive Cavity Pump PCP Equipment

Five Units are already in the field in Altamira Concession in Mexico showing high performance and satisfaction. We are always adding more improvements and features to each new product.